ONAIR / Installation & Setups

Plan the install before the first bolt.

A clear layout, complete component list and sensible handover make a better air-ride project.

THE ANSWER / START HERE

Start by confirming the suspension application, measuring the installation space and agreeing on the electrical, plumbing and service-access plan. Then book the work around the actual parts and scope. A clean-looking trunk is only one part of a sound installation.

Updated October 29, 2026 ONAIR Automotive

An ONAIR workbench with air ride components laid out before installation.
Lay out the complete plan, including the small connecting pieces. The photograph is not a fixed package-contents list.
01 / Fit

Confirm the actual application and any existing modifications.

02 / Space

Measure components with fittings, mounts and service clearance.

03 / Handover

Plan alignment, checks and an explanation of the finished system.

01 / THE DETAILS

Give the project a useful brief.

Decide how the car will be used, whether the air supply should be hidden or displayed, and how much luggage space you want to retain. Record existing wheel, tire and suspension changes that affect the installation.

A visual reference is helpful, but the installer needs to verify your car's mounting points, clearances and component compatibility. Do not assume a layout from another chassis will transfer unchanged.

02 / THE DETAILS

Measure the working space, not just the empty trunk.

  • Tank dimensions, brackets and installed fittings.
  • Compressor mounting, cooling and inlet requirements.
  • Manifold connections and controller-cable route.
  • Reachable drains, fuses and service points.
  • Clearance to trim, cargo and moving parts.
Ask how it will be serviced.

A hidden installation should still allow inspection and removal of components. A permanently enclosed drain or inaccessible fuse is not a finished solution.

03 / THE DETAILS

Check the complete component list.

Account for suspension, management, compressor, tank and moisture control. Then check airline size, fitting threads, wiring, relays, fuses, brackets and any application-specific hardware.

Read each selected option's contents. A management-only listing is not a complete vehicle kit, and a product photograph does not prove that every pictured accessory is included. Use the five-component guide when organising the list.

04 / THE DETAILS

Agree on wiring and plumbing before trimming panels.

The supplied diagrams and component instructions determine power protection, pressure control and suitable plumbing. Plan routes away from heat, sharp edges and moving suspension parts.

Custom hardlines, hidden hardware and display panels can add fabrication work. Agree on the finish, access and scope before installation starts rather than treating every air-ride job as identical.

05 / THE DETAILS

Make the final checks part of the booking.

  1. Mechanical and pneumatic checks.

    Correct fasteners, safe clearances, secure lines and a system that holds pressure.

  2. A verified driving setup.

    Usable travel, normal driving height and alignment.

  3. An ownership walkthrough.

    Know the controls, drains, automatic functions and what to do if behaviour changes.

Preparation and installation timing vary with the application and scope. Confirm the current schedule with the installer; a generic article is not a booking commitment.

ONE MORE THING

The questions that come next.

Can I install it myself?

Only with the appropriate skills, tools, safe support equipment and exact instructions. Suspension, pressure vessels and high-current wiring all require competent work.

Do I have to lose my whole trunk?

No, but usable space depends on the actual car and components. A compact or hidden layout still needs ventilation and service access.

Should I book custom panels before planning the components?

Finalise the component dimensions, mounting and service access first. The presentation should be built around a functional system.

YOUR NEXT STEP / ONAIR

Bring the goal and the component plan together before booking the work.

Discuss an ONAIR installation
Sources & equipment references

General education is not a replacement for the instructions supplied with your exact components. Product-specific ratings and procedures do not transfer automatically to another setup.

Back to the answer